Our team members are experienced with Modularization, Fabrication Onshore and offshore projects.
We have jointly developed amongst the most compact and cost-effective designs drastically reducing the number of modules required for a project, the field construction window and environmental footprint.
We understand logistics, shipping and the pros and cons of offshore fabrication.
We know the elements required to design the most cost-effective modules
We look at the entire project from down hole data to finished product.
Our concept is to develop pads with the lowest total installed cost.
Our designs consider the possible radical changes in currency exchange rate which can turn and economical project into a bust before it even ships
COST REDUCTION
At Big Rock Consulting International, we know that only the cost-effective projects get built.
Current low oil prices and carbon taxes require a different approach if we are to continue producing oil and gas in North America and keep North Americans working. We do this by designing and fabricating class leading cost-effective environmentally responsible equipment.
Cost reduction and modularization is what we do, and we believe we are class leaders in the industry because of the way we look at projects and the cost reductions we achieve.
From Value Improvement studies, to Conceptual, Feed and Detail Engineering we have been able to develop cost reductions thought to be impossible make their way to the bottom line.
We work on the basis that every component of a design must meet the following criteria:
Contributes to producing oil.
Contributes to an environmentally responsible design.
Contributes to production companies share holder value.
Is an integral part of a safe design.
An example of achievable Multi-Well pad cost reduction:
I & C cost reduction up to 15%
Electrical cost reduction up to 45%
Electrical Heat Trace cost reduction up to 20% (Northern States, Canada, Alaska, and Russia)
Piping cost reduction up to 30%
Insulation cost reduction up to 25% (Northern States, Canada, Alaska, and Russia)
Structural Steel cost reduction up to 25%
Piling cost reduction up to 30%
Pad area cost reduction up to 50%
Big Rock Consulting International have been able to reduce the number of modules on a pad from thirteen to 1 shipped in two sections.
With new and emerging technologies, we are continuously working to improve on these numbers.
WHY CHOOSE US
We are by intent different in everything we do to our competition.
We go to great lengths to reduce engineering hours using advanced replication techniques that mean our clients don’t pay for the same thing again and again.
We look at the entire project from well head to facility.
We minimize our own costs ensuring our clients’ money goes directly to engineering
Our cost reduction and schedule capabilities mean we may be able to make a project you believe is uneconomic pass the financial gate to proceed and meet a schedule thought to be impossible.
Our team treats each other like family and don’t let each other down.
We believe working with our clients as part of an integral team allows us to achieve goals that working the old way are not even possible.
HEALTH AND SAFETY
At Big Rock Consulting International we believe safety is an integral part of project design.
With the out of the box approach we take to everything we do we have often found that potential safety and environmental concerns can be eliminated or drastically reduced.